SPT Boring Log

Enter the boring's details, its layers and the blows for each 15 cm stretch of the SPT tests to build the boring log — with N for each meter, the compactness or consistency of each layer, the water levels and N plotted with depth — and check NBR 6484's criteria for stopping the boring.

Boring log

STANDARD PENETRATION TEST BORING — SPTSP-01ABNT NBR 6484ProjectResidential buildingLocation120 Acacia St, Campinas, SPCoordinatesE 287 450 · N 7 465 320Ground elevation642.30 mDate10/5/2026Water levelInitial 4.20 m · 24 h 3.90 mElev.(m)Depth(m)Adv.Sam-pleBlows / 15 cm1st2nd3rdNProfileMaterial descriptionNSPT (blows / 30 cm)010203040501.00641.302.00640.303.00639.304.00638.305.00637.306.00636.307.00635.308.00634.309.00633.3010.00632.3011.00631.3012.00630.3013.00629.3014.00628.30AUWBFill of sandy clay with rubble, brown0.80Porous sandy clay, redSoft to medium5.40Micaceous clayey silt, mottled (residualsoil)Medium to very stiff9.80Sandy silt, grey and pink (residual soil)Dense to very dense13.061.00 m · N = 30111232.00 m · N = 30212133.00 m · N = 40322244.00 m · N = 50422355.00 m · N = 60523366.00 m · N = 80634487.00 m · N = 1107456118.00 m · N = 1508578159.00 m · N = 200979112010.00 m · N = 38101217213811.00 m · N = 30/131130/1330/1312.00 m · N = 30/91230/930/913.00 m · N = 30/61330/630/6Initial: 4.20 m4.2024 h: 3.90 m3.901.00 m · N = 32.00 m · N = 33.00 m · N = 44.00 m · N = 55.00 m · N = 66.00 m · N = 87.00 m · N = 118.00 m · N = 159.00 m · N = 2010.00 m · N = 3811.00 m · 30/1330/1312.00 m · 30/930/913.00 m · 30/630/6N: blows over the last 30 cm of the sampler · b/p: blows and penetration (cm) when the drive falls short of 45 cm.Advance: helical auger (AU) to 4.00 m and wash boring (WB) below.Water level: 4.20 m while drilling (▼) and 3.90 m after 24 h (▽).End of boring: 13.06 m — NBR 6484 stopping criterion met.

Stopping criterion met at 13.00 m:

30 blows for the first 15 cm on 3 meters in a row.

Boring

End

Depths from the top of the hole. Leave a water level blank if none was found, and the auger depth blank to leave the advance off the log.

Layers

SPT tests

Depth (m)1st2nd3rdN
3
3
4
5
6
8
11
15
20
38
30/13
30/9
30/6

Blows for each 15 cm stretch. When the sampler falls short of 15 cm, write blows/penetration, such as 30/12, and leave the next stretches blank.

Hammer efficiency

%

For N60; about 70 to 80% for the Brazilian SPT with a hand-lifted hammer.

N is the sum of the blows over the last 30 cm of each test. Compactness and consistency follow NBR 6484's table, from the tests whose sampler lies in the layer; a test that doesn't complete its 45 cm counts as the hardest state. The stopping criteria assume one test per meter.